KPO – Karachaganak Petroleum Operating
EPC of Telemetry Systems; EPC & Software Development of Local Scada System for Supervision; EPC of Instrument and Utility Air Compressor Production Units; EPC of Wellhead Control Panels, Commissioning Assistance Activities; Procurement and Commissioning of Flowmeters and Shutdown Assistance; EPC of Chemical Injection Packages; EPC & Software Development of RTU Systems.
NCOC – North Caspian Operating Company
EPC, testing and commissioning of Wellhead Hydraulic Switching Units (WHSU); EPC and testing of automatic sampling systems for sour and lethal hydrocarbon fluid; EPC and testing of various Chemical and Methanol Injection Units for EPC-2 and EPC-3 Projects; EPC and testing of automatic well sampling systems; EPC and testing of Chemical Injection skids; EPC of Wellhead Control Panels; EPC of Emergency Pressurization Systems; EPC and testing of integrated control system (ICS) c/w fire and gas field equipment for Temporary Refuges, Site Assistance.
TCO – Tengizchevroil
EPC and testing and commissioning of F&G detection system composed of F&G System based on Det-Tronics EQP (Eagle Quantum Premier) system; EPC and testing of HVAC filtration skids.
Maersk Oil Kazakhstan
EPC and testing of Chemical Injection skids; EPC of Wellhead Control Panels, EPC and software development and commissioning activities for the supply of Integrated Control and Safety System (DCS, ESD, F&G and SCADA); EPC and assistance to on-site installation; commissioning and start-up of Control Building Shelters.
Agip KCO
Commissioning and start-up activities for Telemetry System; EPC and software development and commissioning activities for the supply of Integrated Control and Safety System; EPC and testing of AGI Shelters for valve stations; EPC of Wellhead Control Panels, EPC and testing of Power Generation Systems; EPC and testing of Air Compressor Systems; Technical Assistance Services for Precommissioning and Commissioning; EPC and testing of HVAC filtration skids; Hook-Up and Pre-Commissioning including assistance to the installation activities of the equipment and loose equipment; EPC of manual interlocked sampling systems; EPC of skid mounted firefighting deluge units; HP, VHP, SDV Tubing installation, testing, flushing and commissioning.